Considering we began redoing the bedroom in mid-October, I wouldn't say this is fast progress, but progress nonetheless. In October we exposed the brick wall, but left up all the trim. In November we ripped down all the base trim. Thanksgiving weekend we ripped out the window trim and patched up everything we ripped out with joint compound (this was the worst part by far). In December, I painted the bedroom and Aaron painted the new trim. On the second day of January, Aaron took down the awful ceiling fan and installed a new pendant lamp. And tomorrow, the trim gets installed! This weekend is dedicated to building our new bed and wardrobe. We're in the final stretch. It's all downhill and decorating from here on out.